ENICO Ltd in Stoke-on-Trent: products, shipping and shop facts
Shops & Retail in Stoke-on-Trent · Web shop · Unclaimed · Not verified by owner · facts last read 28 November 2026 · read from enico.uk.
Facts
| Name | ENICO Ltd |
|---|---|
| Category | Shops & Retail |
| Summary | ENICO Ltd designs, builds and tests LV switchgear in Stoke-on-Trent — changeover and ATS panels, G99 protection, G100 export and import limitation, generator control, BMS panels, modular skids, container switchrooms and energy monitoring. |
| Website | enico.uk |
| Address | Unit 2, Rafferty Industrial Estate, Sneyd Hill, ST6 2EB Stoke-on-Trent, Staffordshire, United Kingdom |
| City | Stoke-on-Trent |
| Region | Staffordshire |
| Postal code | ST6 2EB |
| Country | United Kingdom |
| Map location | Map |
| Service area | GB |
| Opening hours | Mon–Fri: 09:00–17:00 |
| Phone | +441782369006 |
| sales@enico.uk | |
| Contact page | https://enico.uk/contact |
| Founded | 2022 |
| Languages | English |
| Company number | 14523114 |
| Web shop | Web shop |
| Social profiles | |
| Logo | https://enico.uk/images/legacy/enico-logo.png |
About
A switchgear manufacturer, panel builder and automation company based in Stoke-on-Trent — built around one idea: do the engineering properly and make the paperwork impossible to lose. ENICO designs and builds low-voltage switchgear and control panels: changeover and ATS panels, G99 protection, G100 export and import limitation, switchboards and distribution, generator control, BMS panels — through to complete modular skids and containerised switchrooms with the switchgear installed and tested before delivery. That breadth is deliberate.
Services
- LV Switchgear Manufacture & Assembly · Custom LV switchboards, panel boards and distribution boards designed, built and tested in Stoke-on-Trent. Send your single-line diagram for a fixed quote.
- G99 Protection Panels · G99 mains-protection relay panels built and injection-tested in the UK. Settings to your DNO connection agreement, witness-test support included.
- G100 Export & Import Limitation Panels · G100 export and import limitation panels, fully type-tested to EREC G100 Issue 2 Amd 2 for both directions. Standalone or integrated, DNO pack supplied.
- PV Distribution Boards (PVDBs) · Bespoke PV distribution boards for solar installations — inverter ways, MID generation metering, SPDs, G99 protection and G100 export limitation in one tested panel.
- Changeover & ATS Panels · Manual changeover, motorised changeover and automatic transfer switch panels built and tested in the UK. Generator start signalling and bypass options.
- MCCB Panel Boards · MCCB panel boards built to your schedule — 250A–800A busbars, TP+N ways, incomer options, real fault ratings, integral metering and QR-linked documentation.
- Generator Control Panels · AMF and generator control panels built and tested in the UK — automatic start, load transfer, engine protection and BMS integration.
- BMS Control Panels · BMS and HVAC control panels built to your points list — segregated, ferruled, labelled and tested, with QR-linked as-built documentation.
- Modular Switchgear Skids · Skid-mounted switchgear packages built and tested in the factory — one delivery, one lift, one connection point. UK-wide delivery.
- Container Switchrooms & Modifications · Shipping containers converted into finished switchrooms — insulated, ventilated, fitted with switchgear and tested before delivery. UK-wide.
- Energy Monitoring & Data Logging · Sub-metering panels, MID billing meters, data logging and dashboards — designed, built and installed by a UK switchgear manufacturer.
- G100 import limitation for EV charging hubs and BESS · G100 import limitation for EV charging hubs and BESS — hold import inside the agreed limit, on a controller fully type-tested for import and export. UK-built.
- G100 Export and Import Limitation Panels · G100 export and import limitation panels, fully type-tested to EREC G100 Issue 2 Amd 2 for both directions. Standalone or integrated, DNO pack supplied.
Frequently asked questions
- What is import limitation, and how does it differ from export limitation?
- Both are customer limitation schemes under EREC G100. An export scheme holds what the site sends to the grid at or below the Maximum Export Limit (MEL); an import scheme holds what it draws at or below the Maximum Import Limit (MIL). Export schemes act on generation; import schemes act on controllable load such as charger power, battery charging and heat pumps. The measurement point, the excursion rules and the fail-safe principle are the same — the fail-safe action is mirrored: generation to a safe state for export, load shed or reduced for import.
- When would an EV hub, BESS site or heat-pump project use a G100 import scheme?
- When the chargers, battery or heat pumps you want to add would take the site past its agreed import capacity if they all ran at full power together. Typical cases: a charging hub on a supply sized for a forecourt or depot, a battery that charges from the grid alongside normal site load, or heating plant replacing gas. G100 names EV charge points, storage and heat pumps as loads a scheme may control. Whether the DNO offers limitation or reinforcement is its decision — start from your connection offer.
- How does the MIL in G100 relate to the MIC in my connection agreement?
- Your connection agreement usually states a Maximum Import Capacity (MIC) in kVA. G100 expresses the limit a scheme enforces as a Maximum Import Limit (MIL): a current, agreed with the DNO as part of the application. The DNO agrees how the two relate for your site. Because the MIC is in kVA, power factor can matter as well as kW — we'll check this against your load schedule.
- Does it replace the chargers' load management or the battery's own controls?
- Not necessarily. A G100 scheme can sit above charger or battery load management as the enforcement layer: it measures at the connection point, has tamper-protected settings and fail-safe behaviour, and can override other controllers as the site approaches the limit, while the equipment underneath keeps doing its own optimisation. Some sites use other arrangements the DNO accepts; we'll look at what's on your schedule and confirm the interfaces at quotation.
- What does "type-tested and listed on the ENA Type Test Register" mean for Forms A, B and C?
- Form A goes in with the connection application. Form B is the manufacturer's compliance report. Form C records commissioning. For a scheme that is Fully Type Tested and registered, the register reference on Form C stands in for Form B, and site tests reduce to the communications and power-supply fail-safe checks. We supply the scheme documentation and Appendix C paperwork carrying the register reference for your submission.
- Will the DNO test on site, and can the limit be changed later?
- On-site testing is at the DNO's discretion. If yours chooses to attend, the panel arrives pre-configured and tested and we support the visit. After acceptance the settings are sealed and tamper-protected: the limit can be changed only with the DNO's agreement.
- What does the site need to provide?
- A level base (concrete pad or ground beams), craneage or HIAB access for the delivery, and the incoming and outgoing cables. Everything inside the container is done before it arrives.
- New or used containers?
- Both. New ('one-trip') containers cost more but arrive unmarked; good refurbished units are perfectly serviceable for most sites. We quote the options so you can choose.
- Do you fit out customer-supplied containers?
- No — we supply the container. We buy new or one-trip units in, modify and fit them out in our workshop, and deliver a finished switchroom built to your requirements. One supplier, one responsibility, and no surprises about the container's condition.
- Do I need G100 export limitation?
- If the DNO's connection offer caps your export below what your generation could produce, an export limitation scheme under EREC G100 lets you install the full system and stay within the agreed limit — instead of downsizing the array or battery, or paying for network reinforcement.
- What is import limitation and when is it used?
- The scheme holds what the site draws from the grid at or below the Maximum Import Limit (MIL) agreed with the DNO. It is used where new controllable load — EV chargers, a battery charging from the grid, heat pumps — could take the site past its agreed import capacity if everything ran at full power at once; the scheme holds that load back as the site approaches the limit. The ENICO G100 Controller is type-tested for import limitation as well as export. Whether a DNO offers limitation or reinforcement at a given site is its decision.
- Can the same scheme limit import as well as export?
- Yes. G100 Issue 2 assumes a limitation scheme controls both directions unless it is declared export-only or import-only, and one ENICO G100 Controller manages both at the same site — export held inside the MEL and import inside the MIL from the same point of supply. The import limitation page covers the solar + storage + charging case.
- What's the difference between G99 and G100?
- G99 is about protection — disconnecting your generation when the network needs it to. G100 is about limitation — continuously keeping your export inside the agreed export limit, or your import inside the agreed import limit. A solar or storage site often needs both; where both apply, we build them into one panel with one set of documentation.
- What does ENICO's Fully Type Tested controller do for my project?
- ENICO's share of the paperwork and testing is done before your panel is built. Fully Type Tested is the register status for a scheme type tested by its manufacturer against EREC G100 Issue 2 Amendment 2, the edition DNOs call G100/2, with every unit declared to be built and to perform the same way; ENICO's G100 Controller holds it on the register for Great Britain. The type tests and declaration your DNO relies on are already lodged there, so your Form C quotes the register reference and Form B is not required. Every panel is built to the tested design.
- Will the DNO test it on site, and what does the visit involve?
- Whether to witness commissioning is your DNO's decision. For a Fully Type Tested scheme such as ENICO's, site testing reduces to the fail-safe checks: power and communications are cut to each part of the scheme in turn, and each time the controller must go to its safe state and reset once they are restored. The limits are then set and checked. Where your DNO does choose to witness, the visit is booked into its diary and may be chargeable, so allow for the lead time. The panel arrives pre-configured, we support the visit, and the settings are sealed after acceptance.
- What is a CLS?
- CLS is the abbreviation EREC G100 uses for a Customer Export or Import Limitation Scheme; DNOs such as National Grid Electricity Distribution call it a Customer Limitation Scheme. ENICO's G100 Controller, with its measurement at the point of supply, is the CLS: it controls generation, storage or load to keep the site within its limits. Your connection offer sets those limits as a Maximum Export Limit (MEL), a Maximum Import Limit (MIL), or both. Export limitation holds the MEL; import limitation holds the MIL. One ENICO controller can hold both at the same site.
- Can the scheme use a dump load instead of trimming the generation?
- Yes, where it suits the site. G100 allows a scheme to control load as well as generation, so a dump load sits within the standard. Where the generator cannot be turned down, the controller diverts surplus into heating, hot water or a thermal store and the generator keeps running in normal operation. Two conditions apply: if the scheme goes to its safe state, it acts on the generation; and if the load cannot absorb the surplus, the scheme still holds the export limit by trimming or tripping the generation. ENICO engineers the load, its rating and its interface to the site, confirmed at…
- Standalone panel or built into other switchgear?
- Either. We supply the scheme as its own wall-mounted panel, or fully integrated into the switchgear it belongs with — a PV distribution board, a main switchboard or a control panel — sharing metering and protection where that makes the installation cleaner. It can also share an assembly with G99 protection and generation metering. One panel, one delivery, one set of commissioning paperwork.
- Which inverters, generators and controllers does it work with?
- The scheme controls generation over standard interfaces (Modbus RTU/TCP, digital and analogue signals), so it works with the mainstream solar and battery inverter brands and generator controllers. Control of charger and other load power is engineered to the interfaces your equipment provides. Tell us what's on your schedule and we'll confirm compatibility with the quotation.
- Does import limitation work with EV chargers?
- EV charge points are one of the loads G100 names explicitly. The scheme measures net import at the point of supply and holds charger power back as the site approaches the Maximum Import Limit. Many chargers offer a power-limit interface; we engineer control to the interface your chargers provide and confirm compatibility at quotation. The import limitation page covers charging hubs in more depth.
What they sell
Web shop.
Verification
Unclaimed · Not verified by owner. Nobody has claimed this listing yet, so no fact has been confirmed by the business itself. Verification state: unclaimed.
Key facts on this card: 9 of 11; missing: Features, Booking, order, menu or pricing link. A field with a value was not checked by us. No field was entered by the owner.
Known problems: The opening hours we could read don’t cover Saturday and Sunday.
Is this your business? Claim this listing (free: a code by email is often enough, the claim page says which addresses work; or proof on the website). What claiming means.
Where these facts come from
Read from enico.uk. Last read 28 November 2026 (4 h ago); last changed 4 h ago; listed since 28 November 2026. Every listing is re-checked regularly.
| Fact | Found in | Page |
|---|---|---|
| Name | structured data | / |
| Summary | structured data | / |
| About | page text | /about |
| Address | structured data | / |
| City | structured data | / |
| Region | structured data | / |
| Postal code | structured data | / |
| Country | structured data | / |
| Phone | structured data | / |
| structured data | / | |
| Opening hours | structured data | / |
| Opening hours (structured) | structured data | / |
| Services | structured data | /, /contact, /solutions, /solutions/g100-import-limitation-schemes, /about, /products/container-switchrooms, /products, /products/g100-export-limitation-panels |
| FAQs | structured data | /solutions/g100-import-limitation-schemes, /products/container-switchrooms, /products/g100-export-limitation-panels |
| Languages | page metadata | /, /contact, /solutions, /solutions/g100-import-limitation-schemes, /about, /products/container-switchrooms, /terms, /products, /products/g100-export-limitation-panels |
| Service area | structured data | /, /contact, /solutions, /solutions/g100-import-limitation-schemes, /about, /products/container-switchrooms, /terms, /products, /products/g100-export-limitation-panels |
| Founded | structured data | / |
| Logo | structured data | / |
| Social profiles | structured data | /, /contact, /solutions, /solutions/g100-import-limitation-schemes, /about, /products/container-switchrooms, /terms, /products, /products/g100-export-limitation-panels |
| Contact page | page text | / |
| Company number | page text | / |
| Category | page text | / |
| Web shop | page metadata | / |
Recent checks
- 4 h ago: Added to the directory
How often this listing is read
Since 25 November 2026:
- Read once by AI crawlers: Claude (Anthropic) 1
The page and its machine copies count. Most AI crawlers copy pages that may train a model or fill a search index: such a read is not a person, a visitor or a recommendation. How we count
More in Shops & Retail
Links
- Markdown fact card · JSON fact card (every fact with its source) · llms.txt · API · products API · documentation, OpenAPI and the MCP server
- Report this listing · Remove this listing
How to use this site as an agent
| This page as Markdown | https://aifindme.com/b/enico-ltd.md (or send Accept: text/markdown to this address) |
|---|---|
| This page as JSON | https://aifindme.com/b/enico-ltd.json (or Accept: application/json) |
| This page as llms.txt | https://aifindme.com/b/enico-ltd/llms.txt |
| This page through the API | https://aifindme.com/api/v1/businesses/enico-ltd |
| Start here | https://aifindme.com/agents: what a fact card tells you, the three ways to query, rules and rate limits, freshness, how to add or correct a listing. Long form: https://aifindme.com/for-ai-agents |
| Search API | GET https://aifindme.com/api/v1/businesses?q=…&category=…&city=…&kind=shop&verified=1&open=now · OpenAPI · documentation |
| MCP server | POST https://aifindme.com/mcp (Streamable HTTP, no key): search_businesses, get_business, get_products, list_new_listings, list_categories, list_cities |
| Directory index | https://aifindme.com/llms.txt: every category and the biggest cities with counts, and the latest listings · https://aifindme.com/llms-full.txt: one compact entry for each of the most complete listings (about a thousand) |
| Agent skill | https://aifindme.com/skills/aifindme/SKILL.md: when and how to use this directory and how to cite it (Agent Skills format) |
| Views | Add ?view=ai or ?view=human to any address. Both carry the same facts and links; the presentation differs. |